For completion and close-out
New build handover package: as-built calculations, EPCs and the evidence pack

The handover package closes out Part L on a completed development. We update the calculations to what was actually built, produce the on-construction EPC for each dwelling, and assemble the evidence set — as-built calculations, air test certificates, commissioning records and the compliance report — in the form building control asks for at completion. It suits sites where design-stage work was done elsewhere, or where certificates and paperwork were never finished.

Who runs your contract
Awais Sarwar, MSc — Accredited Energy Assessor
Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC Ltd, which trades as Part L Consultant. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties, and is currently studying an MSc in philosophy alongside running the business.
Off the clock: cricket, family time, an MSc in philosophy in progress and finding London's best food.

Awais Sarwar
Founder · Accredited energy assessor
What you get
Everything this package covers.
As-built SAP calculations
Each dwelling type re-modelled against what was installed, using your as-built drawings, product data and substitution records.
On-construction EPCs
The certificate for every completed dwelling, produced from the as-built calculation.
Evidence pack
As-built calculations, air test certificates, ventilation commissioning records and the compliance summary, collated per plot.
Gap review before we start
A written list of what is missing, so you know what has to be obtained rather than discovering it at completion.
Plot tracker
One schedule showing which plots are complete, which are waiting on evidence and what is outstanding from whom.
When it applies
Projects this package is built for.
- Dwellings finished, or close to finished, without as-built calculations
- Sites where the original assessor is no longer involved
- Plots that cannot be sold or let because the EPC was never lodged
- Handovers where building control has asked for the Part L evidence
Not included
What sits outside the fee.
- Retrospective design-stage calculations, unless instructed separately
- Remedial works or re-testing where the build does not meet the specification modelled
- Building control fees
- Warranty provider paperwork outside the Part L evidence set
Guide fee
Quoted per site, guide only
See all guide fee bands for individual services.
Process
How the instruction runs.
Step 1
Gap review
You send what exists; we return a written list of what is still needed.
1–2 working days
Step 2
Fixed quote
A fee for the site, with the plots and evidence set out.
Step 3
As-built modelling
Each type updated to the built specification and test results.
3–5 working days
Step 4
EPCs and pack
Certificates produced per plot and the evidence pack issued.
Bundled services
The individual services this brings together.
Other packages
Other combined instructions.
Send the project and get a fixed fee.
Guide bands only. Fixed quote in writing before work starts.

