Glossary

    Every Part L term we use, without the jargon

    46 definitions covering Part L, SAP, SBEM and the compliance evidence, in the language a building control body expects. Each one is linked automatically the first time it appears in a guide on this site.

    46 of 46 terms

    accreditation scheme

    An approved body, such as Elmhurst Energy or ECMK, that qualifies, audits and maintains standards for the assessors permitted to produce and lodge calculations.

    air permeability

    A measure of uncontrolled air leakage through the building fabric, tested on completion and fed into the as-built calculation.

    Read more

    air pressure test

    The on-site test that measures how much air leaks through a completed building's fabric, carried out by a competent tester and reported as part of the compliance evidence.

    Read more

    Approved Document L1

    The volume of Approved Document L that applies to dwellings, covering both new dwellings and work to existing homes.

    Approved Document L2

    The volume of Approved Document L that applies to buildings other than dwellings, covering new non-domestic buildings and work to existing ones.

    Approved Document L3

    The volume introduced with Part L 2026 dealing with on-site renewable electricity generation for new dwellings and buildings containing dwellings.

    Read more

    as-built SAP

    The SAP assessment reworked at completion using what was actually built and installed, including the measured air tightness result and any specification changes.

    Read more

    BER

    The carbon emission rate calculated for a non-domestic building, which must not exceed the target emission rate for that building.

    BPER

    The primary energy rate calculated for a non-domestic building, compared against its target primary energy rate.

    BREL report

    The standard output produced from a SAP assessment for new dwellings, submitted with photographic and commissioning evidence to demonstrate Part L compliance.

    Read more

    BRUKL report

    The compliance output produced by SBEM or an approved dynamic simulation model for non-domestic buildings, showing the building's rates against the targets.

    Read more

    building control body

    The local authority or registered building control approver that checks a project against the Building Regulations and receives the Part L compliance documents.

    commissioning

    Setting up and testing building services on completion so they operate as designed, evidenced by records submitted with the compliance documents.

    Read more

    consequential improvements

    Additional energy efficiency measures that may be required when certain work is carried out to larger existing buildings.

    DER

    The carbon dioxide emission rate calculated for the dwelling being assessed, which must not exceed the target emission rate.

    Read more

    design stage SAP

    The SAP assessment produced from drawings and specifications before work starts, used to demonstrate that the design as proposed can satisfy Part L.

    Read more

    DFEE

    The space heating and cooling demand of the dwelling as designed, a fabric-only measure independent of the heating system.

    DPER

    The primary energy demand calculated for the dwelling being assessed, which must not exceed the target primary energy rate.

    dynamic simulation modelling

    An hourly thermal model of a building used in place of SBEM where the design is complex, and required for some servicing strategies and overheating work.

    Read more

    fabric performance

    The thermal performance of the walls, roof, floors, windows and doors that form the building envelope, before heating systems are considered.

    g-value

    The proportion of solar energy passing through a glazing unit. Higher g-values bring more useful winter heat but increase overheating risk in summer.

    glazing ratio

    The relationship between glazed area and floor area used in extension work, where Part L allows glazing equal to 25% of the new floor area plus the area of any openings removed.

    Read more

    heat pump

    A system that moves heat from outside air, ground or water into a building, typically delivering low carbon heating at high seasonal efficiency.

    higher-risk building

    A building falling within the higher-risk category under the building safety regime. Higher-risk buildings have their own, later commencement date under the Part L 2026 arrangements.

    Read more

    material change of use

    Work that changes what a building is used for, such as an office becoming flats. It brings specific Part L requirements for the elements being altered or created.

    notional dwelling

    A reference building of the same size and shape as the actual one, built to the specification set out in Part L, from which the targets are calculated.

    on-construction EPC

    The Energy Performance Certificate produced for a newly built dwelling from the as-built calculation, and lodged before the building is occupied, sold or let.

    Read more

    overheating assessment

    An assessment of the risk of high indoor temperatures in new residential buildings, carried out under the overheating requirements of the Building Regulations.

    Part L

    The part of the Building Regulations covering conservation of fuel and power. It sets the energy and carbon standards new and altered buildings must meet, and is supported by Approved Documents L1 and L2.

    Read more

    Part L 2021

    The edition of Approved Document L that came into force on 15 June 2022, introducing tighter fabric and primary energy standards and the BREL report for new dwellings.

    Part L 2026

    The edition of Approved Document L published on 24 March 2026, which raises the standards for new buildings and adds requirements on on-site renewable electricity generation.

    Read more

    photographic evidence

    Dated site photographs recording insulation, junctions and services as they were installed, required as part of the compliance evidence for new dwellings.

    Read more

    renewable technologies

    On-site generation and low carbon systems such as solar photovoltaics and heat pumps, which reduce the emission and primary energy rates in a Part L calculation.

    SAP

    The Government methodology for assessing the energy performance of dwellings against Part L, carried out from design information rather than a site survey.

    Read more

    SBEM

    The calculation tool most commonly used to assess non-domestic buildings against Part L, modelling the building zone by zone against a notional equivalent.

    Read more

    solar PV

    Panels that generate electricity from sunlight. Under Part L 2026 on-site renewable electricity generation is dealt with in its own Approved Document.

    Read more

    specification change

    A product or system swapped after the design stage assessment. Every substitution has to be re-checked, because a like-for-like swap on paper can still fail the calculation.

    TER

    The carbon emission rate a dwelling must beat, derived from a notional dwelling of the same size and shape built to the standards in Part L.

    Read more

    TFEE

    The fabric energy efficiency limit a dwelling must meet, so a good heating system cannot be used to excuse weak insulation and glazing.

    thermal bridging

    Heat loss concentrated at junctions and penetrations in the building fabric, accounted for in calculations either through accredited details or calculated psi values.

    TPER

    The primary energy limit a dwelling must meet, derived from the notional dwelling used in the SAP calculation.

    transitional arrangements

    The rules that decide whether a project is assessed under the outgoing or incoming edition of Part L, based on when the application was made and when work started on that individual building.

    Read more

    U-value

    A measure of how quickly heat passes through a building element such as a wall, roof, floor or window. Lower U-values mean better performance.

    ventilation strategy

    The way fresh air is supplied and stale air removed, from trickle ventilators and extract fans to mechanical ventilation with heat recovery. It must work alongside the airtightness assumed in the calculation.

    y-value

    The overall heat loss allowance from thermal bridging used in a SAP calculation, either a default figure or one built up from individual junction psi values.

    zoning

    Dividing a non-domestic building into thermal and activity zones so each area is modelled with its own use, servicing and occupancy pattern.

    Awais Sarwar, founder of Part L Consultant

    Who runs your contract

    Awais Sarwar, MScAccredited Energy Assessor

    Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC Ltd, which trades as Part L Consultant. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties, and is currently studying an MSc in philosophy alongside running the business.

    EPC Register
    Accredited assessor
    MSc
    Built environment
    MSc Philosophy
    Currently studying
    10+ years
    London property
    Part L focus
    Design to as-built

    Off the clock: cricket, family time, an MSc in philosophy in progress and finding London's best food.

    Awais Sarwar away from work, out in a London park

    Awais Sarwar

    Founder · Accredited energy assessor

    About Awais
    Last word

    Ready when you are.

    Send the drawings, get a fixed written quote, and have the design-stage calculation before work starts on site. That's the whole process.

    020 3092 8551
    Transparent pricing No obligation SAP, SBEM and EPCs England and Wales
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · Accredited energy assessor
    SAP & SBEM calculations·
    Fixed written quotes
    Call